UL 508A Control Panels
What the UL 508A label covers, how SCCR is set, and what we check before a panel is labeled.
Every WETS AI control panel goes through 13 checks in our Houston shop before it ships: build inspection, electrical tests and full functional tests with the final program. You can witness the factory acceptance test (FAT) on request, and we verify the system again on site at the site acceptance test (SAT).
The same checks, in the same order, on every panel we build.
Testing starts long before the panel ships. Each stage catches a different kind of problem, so nothing is left for startup day.

The factory acceptance test proves that the panel and its program do what the control narrative says, before the panel leaves our shop. Problems found here take minutes to fix. The same problem found on site can cost days.
You are welcome to witness the FAT at our Houston shop on request. We agree the test procedure with you in advance, work through it together, and record the results. Anything that needs fixing is corrected and retested before the panel ships.
After installation, the site acceptance test checks the system with the real field wiring, instruments and equipment. Signals are confirmed from the field device to the HMI, and sequences are run with the actual process.
Because the panel was proven at FAT, SAT can focus on what changes on site: field connections, instrument ranges and how the process really behaves.

FAT and SAT are two halves of the same proof.
One happens in our shop before shipping. The other happens once the panel meets your real process.
| FAT | SAT | |
|---|---|---|
| Where | Our Houston shop | Your site, after installation |
| What it proves | The panel and program match the design | The system works with your process |
| Signals | Simulated I/O | Real field devices |
| Who attends | Our team, and you on request | Our team and your site team |
| Fixes | Made and retested before shipping | Made on site and recorded |
Yes, on request. We agree the procedure with you in advance and work through it together at our Houston shop.
Every panel. All 13 checks are carried out on every panel we build, whether or not a formal FAT is requested.
Yes. The test is done on power circuits with drives, PLCs and other electronics isolated, so they are not exposed to the test voltage.
It is fixed and retested before the panel ships, and the result is recorded.
Yes. We verify the system on site at SAT with your team, using the real field devices and process.
What the UL 508A label covers, how SCCR is set, and what we check before a panel is labeled.
Programs written in-house for Allen-Bradley, Siemens and Schneider Electric, tested at FAT.
Your drawings and bill of materials, built, marked and tested to UL 508A.
Ask us for a quotation and include your testing or FAT requirements. We will build the test plan into the schedule.